Access Keys:
Skip to content (Access Key - 0)
 

Setting up a Testbed

Here is a testbed I assembled for the UI guys:

  • Siemens N148 gateway and power supply
  • ABB dual switching actor SA/S 2.10.1
  • Busch-Jaeger 6326 triple switch plus room temperature controller

The exported ETS data is here:

Does anybody know why on earth ETS exports groups and devices in different formats???

Due to the wood not really VDE compliant, but who complains

Recently Updated
by Jörg Falkenberg (11 Jul)
History and changes (iknx)
Navigate space
 
Labels:

Added by Administrator

Last edit by Marc Fleury on May 25, 2009 13:02

  1. May 15, 2009

    Marcus Redeker says:

    I like the wood But do you use the bus power also for the needed secondary pow...

    I like the wood

    But do you use the bus power also for the needed secondary power of the IP gateway?

    That is not KNX compliant

    1. May 22, 2009

      Marc Fleury says:

      Yes the bus power is connected to the secondary input.  There is enough pow...

      Yes the bus power is connected to the secondary input.  There is enough power from the main line to power the IP gateway and the 2 actuators shown here.  I did the same on the development gig I gave juha.

Adaptavist Theme Builder Powered by Atlassian Confluence
Free theme builder license